View Post
Crawler Crane dis- and reassembly in 6 days

Crawler Crane dis- and reassembly in 6 days

 / 
By
Alisa Evans
 / 
June 2016
Crane owners, Jon Moore, needed their 400T Kobelco CKE 4000C JF 02 crawler crane dismantled at Sekondi Naval Base and reassembled at Kpone, Tema 250 kms away. The crane was at the time working for Tullow Oil in Sekondi where it was being used to help fabricate jumper spools for the TEN Project. The...